This
turnkey project divided at two groups:
Group 1:
This group is a complete steam production
plant for Mobarake Steel Complex galvanized
plate production line, including two,
35T/h watertube steam boiler.
Osve Company has manufactured and
installed, one 180 m3/h Reverse Osmosis
water treatment system, supported by
high technology DCS control system and
complete monitoring, by cooperation of
PACT Company.
Because of being this project as a
turnkey project, Osve Company has
manufactured and installed all the civil
work ,control, instrumentation and
electrical of this project and has
manufactured all the pressure vessels
and storage tanks (2000m3 Atmospheric
storage tank) by itself.
Group 2:
This group is a complete steam production
plant for Mobarake Steel Complex tinning
plate production line, including two,
35T/h watertube steam boiler.
In this group, Osve Company has done the
same procedure of manufacturing like
group one for installing of civil jobs
and Reverse Osmosis water treatment
plant (120m3/h) and the vessels, tanks,
instrumentation and control and
electrical.
*