This
project include the complete overhaul
of one 75T/h ,50bar ,superheat steam
boiler with increasing the capacity
of boiler with changing the arrangement
of tubes to 90T/h.
The procurement of material (tubes and
headers) was from Germany by Osve Company.
Osve Iran Industrial Group has done
the bending of 1300 peace of tubes in
1300 different shapes.
Dismantling and installing with hydro
test was responsibility of Osve Iran
Industrial Group.
*
Click on images to pop up larger photo.
|