|
Design
manufacturing, installation and operation
of one 120 T/h watertube steam boiler
by 16bar pressure including the complete
DSC and monitoring was the principal
responsibility of Osve Iran Industrial
Group which has done by cooperation
of it’s Canadian joint venture.
*
Click on images to pop up larger photo.
|