Home Page

 
Pars Paper Plant :

Pars Paper project was included one 90T/h superheat steam boiler which had an accident by explosion.
Osve Iran Industrial Group with cooperation of its Canadian joint “Thermo Design Inc.” and the new technology have designed and manufacture, an Economizer for installation instead of old big Economizer and this company has improved the efficiency of boiler and by using the finned tube instead of bare tube has reduced the volume of Economizer to ¼.
Osve Iran Industrial Group has installed the new DCS control system by using the new technology of fiery and Moore Company for this boiler.

* Click on images to pop up larger photo.

   

 

 


 

   


Copyright ©2003 Osve Iran Industrial Group
Design by
homadesign.com